Bekker Port can now handle ships up to 30,000 tonnes due to increased depth
Due to continued investment by Bekker Port in upgrading the capabilities of its berths it is now possible for cargo ships with load-carrying capacity of up to 30,000 tonnes to be serviced.
Excavation works carried out by Nord Company OÜ have increased the depth to 10.5 m (EH2000) with measurements conducted and verified by Meremõõdukeskus OÜ.
Bekker Port can now handle ships up to 30,000 tonnes due to increased depth
Projekt koostöös KIKiga
Tallinna Bekkeri Sadamale väljastati ISO 9001:2015 sertifikaat
The port acquired one of the largest material handling machines in Estonia
Tallinna Bekkeri Sadama detailplaneeringu muutmine
Suurendasime territooriumi asfalteeritud pinda